Close
Construction Consultants

Boston University

Boston, MA


Boley Additive Assembly Laboratory (AAL)


Project Features
  • 1,525 sf
  • New partitions and doors, new fume hoods and laboratory casework, and new architectural finishes.
  • Modifications to mechanical, electrical, plumbing, fire protection, fire alarm, and security systems.
  • Occupied during construction
  • New roof steel dunnage to support new air handler, chiller and exhaust fans.
  • StartSmart® Preconstruction Program
  • Project was completed during the Covid19 pandemic.

JM Coull was selected by Boston University for the interior renovations of occupied faculty offices and laboratories in the Boley Additive Assembly Lab (AAL), part of the Mechanical Engineering department.

The AAL facility focuses on “understanding and harnessing the relationships between materials synthesis, assembly process, and multi-scale architecture in additive manufacturing (AM) to create new functional materials and devices."

Customized three-dimensional (3D) printing is a key feature of these labs and is featured in a wide variety of applications.
Delivery Method:
General Contracting

Architect:
MPM Architecture, Boston, MA