Close
Construction Consultants

Jabil (formerly Nypro Inc.)

Clinton, MA


Cleanroom, Office, & Support Spaces


Project Features
  • 8,800 sf total
  • ISO 8 cleanroom
  • Removable wall panel system
  • MEP systems configured to support future ISO 7 capability
  • Catwalk system
  • Performed on operational molding floor with 24/7 production schedule
  • Completed in just 11 weeks

JM Coull completed the design and construction of cleanroom space with a structural mezzanine for mechanical and office space.
Delivery Method:
Design-Build

Architect:
Woodbrier Associates,
West Roxbury, MA

“I would like to take this opportunity to thank you and your entire team. I was very impressed with the way the entire project was handled. JM Coull did an excellent job bringing the project in on budget and earlier than originally anticipated. I think I speak for the entire team in saying if you need a recommendation, feel free to call."

– Frank Foley, Program Manager