Construction Consultants

Skyworks Solutions, Inc.

Woburn, MA


Wafer Fabrication Facility Expansion


Project Features
  • 14,000 sf total
  • New bay and chase photolithography cleanroom
  • New scribe and test cleanroom
  • New structural steel frame over cleanroom area
  • Make-up air systems
  • Recirculating air handlers
  • Cooling towers
  • Molecular Beam Epitaxy (MBE) area designed and constructed
  • Fab temperatures maintained at 68°F +/- 2%
  • Low airborne molecular contamination, vibration, noise level, and UV light protection in photolithography cleanroom

JM Coull completed a project involving the design, permitting, and construction of a new 4" Gallium Arsenide wafer fabrication facility within an existing, fully operational fab. The wafers are used in wireless networking applications throughout multiple industries, including but not limited to aerospace and defense, automotive, media, consumer electronics, and mobile devices.
Delivery Method:
Design-Build; Open book with GMP

Architect:
Woodbrier Associates
West Roxbury, MA